Operatons and Project Management, SHR039-6

Submission Deadline Marks and Feedback
Before 10am on:
Click or tap to enter a date.
20 working days afer deadline (L4, 5 and 7)
15 working days afer deadline (L6)
10 working days afer deadline (block delivery)
Click or tap to enter a date.
Unit ttle & code Operatons and Project Management, SHR039-6
Assignment number and ttle Assignment 02: Project Management Report
Assessment type Writen Report
Weightng of assessment 60%
Size or length of assessment 2,000 words
Unit learning outcomes 1. An in-depth knowledge and critcal appreciaton of Operatons and Project Management tools and
techniques for various business planning and decisions within organisatons.
2. Effectvely determine how Operatons and Project Management can support the corporate strategic
plan of an organisaton, improve performance and implement change while using appropriate tools to
support decisions and project planning.
What am I required to do in this assignment?
You will produce a project plan for a suitable project for your work-place. If there is not much scope of developing a project plan in relaton
to your work-place, you must agree a project ttle of your choice and scope with your tutor.
The Project Plan will include the use of Project Management tools and techniques studied and discussed in the class. You will need to
submit the project plan (along with relevant appendices and supportng documentaton) as an Individual Report.
You should include the following:
• Project Introducton and Objectves
• Project team and their roles
• Project stages and key deliverables, with a discussion centered around the 4 D’s concept
• Project tme management (Work Breakdown Structure; Actvity List; Network Diagram and Critcal Path)
• Project cost management plan
• Project Risk Log/Risk Register
What do I need to do to pass? (Threshold Expectatons from UIF)
In order to pass Assessment 2 you will need to:
 Adequately analyse the requirements of a given project planning task;
 Produce a satsfactory project plan based on appropriate project management scheduling tools and techniques.
How do I produce high quality work that merits a good grade?
We will be flling this secton in together in class on Click or tap to enter a date. make sure you have downloaded/printed out the
Assignment Brief and bring it to the session with you.
You will need to produce a high-quality individual report that adheres to Business Report conventons (e.g. an appropriate format, an
executve summary, etc.) and that displays a professional level of presentaton and polish.
You should carefully analyse the requirements of your project scenario and produce a logical and detailed project plan with the required
documentaton.
You should demonstrate a sound understanding of the tools and techniques of project management within the given context, both the
purpose of the project management concepts and the issues in implementaton.
How does assignment relate to what we are doing in scheduled sessions?
The assignment focuses on key Project Management concepts and models discussed in the scheduled sessions, namely project planning
tools and techniques.

2

How will my assignment be marked?
Your assignment will be marked according to the threshold expectatons and the criteria on the following page.
You can use them to evaluate your own work and consider your grade before you submit.
3rd Class – 40-49% Lower 2nd – 50-59% Upper 2nd – 60-69% 1st Class – 70%+
Use of
academic
concepts,
models, theory
and literature
35%
Fair use of academic literature,
fair use of course concepts,
models and theories but lacking
in depth and/or breadth in
some areas.
Good use of academic literature
in connecton to problem set and
good overall applicaton of
multple course concepts, models
and theories.
Very good use of academic
literature in connecton to
problem set and very good
overall applicaton of multple
course concepts, models and
theories.
Excellent use of academic
literature in connecton to
problem set and excellent overall
applicaton of multple course
concepts, models and theories.
Strength of
Project
Management
documentaton
and discussion
35%
Fair quality of planning outputs
and documentaton but limited
in scope or depth and uneven
in consistency across different
planning areas.
Some questonable logic on
WBS, Actvity List.
Gant Chart acceptable but
contains mistakes.
Network Diagram contains
some anomalies;
CP largely correct;
OR
Network diagram presented in
MS Project format
Good quality of planning output
and documentaton with
reasonable consistency. May be
limited in scope/depth in some
areas.
Intro and Project Objectves clear
and appropriate. Good WBS/PBS,
complete, but issues with
content/logic. Actvity List
satsfactory. Lack of minor
resources. Largely correct WBS,
Actvity list. Network diagram
largely correct. CP identfed.
Project budget largely correct.
Risks identfed and analysed,
atempt made at planning
responses. Good specifcaton of
quality responsibilites, quality
criteria and quality methods.
Very good quality of planning
output and documentaton with
good consistency across most
areas. Sound scope and depth in
most areas.
Intro & Project Objectves well
expressed and almost SMART.
Well considered WBS, Actvity
List. Network Diagram good. CP
correct. Project budget is good
and correct. Risks identfed and
analysed, detailed responses
planned. Quality responsibilites,
quality criteria and quality
methods completed with details
which are logical & consistent.
Excellent quality of planning
outputs and documentaton,
with clear consistency across all
areas and sound scope and
depth.
Intro & Project Objectves clear,
precise and SMART Good
consideraton of WBS, Actvity
List. Network Diagram neat and
correct. CP clear & correct. Risks
identfed and analysed, detailed
responses planned, with
proximity of risks. Quality
responsibilites, quality criteria
and quality methods completed
to a high standard, with systems
described for tracking and
updatng
Structure,
presentaton
and
referencing
10%
Fair structure and design.
Report structure used by with
minor errors and/or partal
implementaton. Referencing
present but some errors.
Good structure and design.
Report structure used by with
minor errors and/or partal
implementaton. Referencing
present but with minor errors.
Well-structured arguments and
design with reasonable flow of
the report. Formal report
structure used. Mostly accurate
referencing.
Well-structured arguments with
good design of the sectons with
good flow of ideas. Formal report
structure used. Accurate
referencing.
Discussion of
project stages
and 4Ds
20%
Acceptable discussion of the
project stages using 4Ds.
At least two of the 4Ds are
discussed satsfactorily
Good discussion of the project
stages using 4Ds. All 4Ds are
discussed well
Very good discussion of the
project stages using 4Ds. All of
4Ds are discussed very well along
with their deliverables
Excellent discussion of the
project stages using 4Ds. All of
4Ds are discussed excellently
along with their deliverables