Blog
Prepare a comprehensive quantity and cost estimate
Prepare a comprehensive quantity and cost estimate for a small Commercial Project (Drawings
are attached). The estimate should include the following components:
• Office and job overheads (from assignment 2)
• Excavation
• Concrete
• Masonry
• Metal
• Thermal and moisture protection
The drawings provided are not comprehensive so you might have to make some assumptions
related to the quantities and cost. If so, please include a list of assumptions in the beginning of
your final report. You also have to prepare an estimate summary sheet at the end (Sheet is
attached as an excel file). You all have to include your overhead estimate from Assignment #2 in
the summary sheet.
The post Prepare a comprehensive quantity and cost estimate appeared first on My Assignment Online.
